construction steel scaffolding - construction steel scaffolding

1.construction steel scaffolding, 2.ringlock,frame scaffolding, 3.typws of scaffolding system, 4.steel scaffold formwork - details see: https://www.buildingsupplieshub.com/construction-steel-scaffolding-10079394
Place of Origin: Hebei China (Mainland)Brand Name: XMWYModel Number: construction steel scaffoldingFunction: support the plywood
Material: Q235 cold rolled steelsurface finish: Electrophoretic coatingStandard: ISO9001,ISO14001,ISO18001size: adapt to different projects
indoor scaffolding system: yesconstruction scaffolding system: yesframe: scaffold pipe,save clamps 
construction steel scaffolding
contact supplier for construction steel scaffolding


construction steel scaffolding

tags: scaffolding,scaffold, scaffolding system/material/parts, steel/metal/aluminium scaffodl, cuplock/ringlock/h frame/main frame/layer/tubular scaffolding, scaffolding props, boards/planks, couplers/clamps, stairs,ladders,haki/peri scaffold, scaffolding manufacturer in china, scaffold popular in Southasia, Mid-east, South America,efficient construction material

construction steel scaffolding

(replace h-frame)

1. Quick Info

a. Model: Quick -erected SCAFFOLDING.(pure steel, electrophoretic painted)

b. Application: used together with plywood for concrete form.

d. Load Capacity: 3 to 4 tons per s.q.m.(whole system)

e. Installation: A group of 4 workers can erect 300s.q.m in 8 hours.

2. Product Model

3.Product Detail

quicklock scaffolding system ( need no scaffold clamps)

4.At construction works

new type CUP-LOCK scaffolding system

5.Specifications


ItemLength(m)Thickness(mm)Outer Diameter (mm)
Vertical Standrads2.553.048
1.953.048
1.353.048
1.053.048
0.753.048
Horizontal Ledgers1.222.7548
0.872.7548
0.472.7548

6. Design

We can design for each specific project according to your structural drawings.

We also have standard match that allow for more flexible uses.

Any further questions, pls feel free to contact with us. It'd be pleasure to hear from you.


Packaging Detail:1 container can fit about 20 tons.
Delivery Detail:within 20 days after payment

Related Product for construction steel scaffolding