construction scaffolding adjustable base jack for frame cuplock ringlock scaffolding - SJ
Place of Origin: Tianjin China (Mainland) | Brand Name: ADTO | Model Number: SJ | Type: Solid / Hollow, Base Jack/ U-head |
Surface: Painted, Zinc-coated, Hot dipped galvanized | OD: 30/32/34/38MM | Length: 600mm, 550mm, 580mm, 500mm, etc | Marketing: Worldwide adjustable base jack |
Plate: 120x120mm, 140x140mm, 150x150mm | Plate thickness: 4mm, 5mm, 6mm | Use: for frame, ringlock, cuplock scaffolding etc | Color: Silver adjustable base jack |
Material: 20# steel |
Adjustable base Jack
Adjustable base Jack is an important fitting required in any scaffolding system to provide full support and bear heavy weight at the same time. itwas Used in system scaffolding as a leveling system to cope with variations in ground levels offering a safe working load.
adjustable base jack Technical information
Base plate:120x120mm, 140x140mm, 150x150mm
U head jack base plate:120x150x50mm,150x150x50mm, 120x120x50mm
Type:solid/hollow; T jack/U head jack/swivel jack
Size:From 30/32/34/38mm (solid and hollow)
Material:20# carbon steel or seamless pipe
Length:550/580/600/650/700mm, etc
Surface finish:painted, electric galvanized, hot-dip galvanized
Features:
Robust construction
Corrosion resistance
High efficiency
Fine finish
We have the professional sales team and engineer team which have more than 50 professional persons, along with the logistic team, constituting the powerful and professional sell and service team. Hope to cooperate with your esteemed company!!
Adjustable Base Jack
Pipe | Plate |
M30(Solid) x 600mm | 120 x 120 x 4mm |
M32(Solid) x 600mm | 140 x 140 x 4mm |
M34(Solid) x 600mm | 150 x 150 x 6mm |
38(Hollow) x 4 x 600mm | 120 x 150 x 5mm |
Adjustable U-Head Jack
Pipe | Plate |
M30(Solid) x 600mm | 120x100x45mm |
M32(Solid) x 600mm | 120x150x50mm |
M34(Solid) x 600mm | 150x150x50mm |
38(Hollow) x 4 x 600mm | 120x120x30mm |
Scaffolding factory overview
T jack
U head jack
Base jack packing in pallet
Scaffolding Gold Supplier
We can supply below scaffolding such as frame scaffolding, metal plank, base jack, adjustable jack props, formwork, pipe, tubes, cuplock, ringlock scaffolding, etc.
Packaging Detail:suitable for sea transportation |
Delivery Detail:Within 10-25 days after receive the L/C or Deposit |