Construction galvanized roofing material,ceiling building construction material - JY820
Very Cheap Lightweight galvanized Roofing Materials,ceiling building construction material - details see: https://www.buildingsupplieshub.com/construction-galvanized-roofing-material-ceiling-building-construction-material-10081468
Place of Origin: Shandong China (Mainland) | Brand Name: JY | Model Number: JY820 | Material: Color Steel Plate |
Type: Plain Roof Tiles | zn coating: az50g | piece: 350piece/ton | length: 3660mm |
hardness: full hard |
Constructiongalvanizedroofingmaterial,ceiling buildinig construction material
Material: galvalume/galvanized steel coil,prepainted galvalume/galvanized coil | ||||||
thickness/mm | width before corrugation/mm | wdith after corrugation/mm | zinc coating/g | alu-zinc | color | length/meter |
0.14~0.65 | 750/762/1000 | 660/750/800/900 | 60~150 | 30~70g | Red, blue,as RAL color code | 1.8-4m |
common roof types as below: | ||||||
Type | spead width | valid width | height of wave | wave distance | wave numbers | application |
YX28-205-820 | 1000mm | 820mm | 28mm | 205mm | 4 | roof |
YX35-125-750 | 1000mm | 750mm | 35mm | 125mm | 6 | roof,wall |
YX8-130-910 | 1000mm | 910mm | 8mm | 130mm | 7 | roof |
YX35-280-840 | 1000mm | 840mm | 35mm | 280mm | 3 | roof,wall |
YX25-210-840 | 1000mm | 840mm | 25mm | 210mm | 4 | roof,wall |
YX51-250-750 | 1000mm | 750mm | 51mm | 250mm | 3 | roof,wall |
YX16-65-850 | 1000mm | 850mm | 16mm | 65mm | 13 | roof,wall |
YX30-160-800 | 1000mm | 800mm | 30mm | 160mm | 5 | roof,wall |
YX15-225-900 | 1000mm | 900mm | 15mm | 225mm | 4 | roof |
YX10-110-880 | 1000mm | 880mm | 10mm | 110mm | 8 | roof |
YX12-108-864 | 1000mm | 864mm | 12mm | 108mm | 8 | wall |
YX40-250-750 | 1000mm | 750mm | 40mm | 250mm | 3 | roof |
YX35-210-840 | 1000mm | 840mm | 35mm | 210mm | 4 | roof |
Remarks: | ||||||
1)Loading Port: Qingdao port, China | ||||||
2)Package: in bundle, packed with water-proof papers and binded with metal strips, with wooded pallets if necessary | ||||||
3)Payment terms: T/T, L/C at sight | ||||||
4)Deliveryy time: about 30 days after receipt of deposit or L/C at sight |
Packaging Detail:STEEL PALLET WITH WATER PROOFING PAPER |
Delivery Detail:30days in busy season |