construction formwork tie rod - high strength tie rod

construction tie rod for formworks, Easy to use and other size is available - details see: https://www.buildingsupplieshub.com/construction-formwork-tie-rod-10073649
Place of Origin: Tianjin China (Mainland)Brand Name: TPModel Number: high strength tie rodquality management certification: GB/T 19001--2000---ISO 9001:2000 Quality Management certifications
construction tie rod: steel Q235formwork tie rod: steel 45#tie rod fastener: 40Crformwork fastener tie rod: 42CrMo
tie rod for fastener: diameter 12mm to 60mmsteel tie rod: high strengthsteel fastener tie rod: high breaking load 
construction formwork tie rod
contact supplier for construction formwork tie rod


Production Description of tie rod
  • construction tie rod for formworks
  • Tie rod with different types:

    1,ordinary intensity tie rod.

    2, high strength tie rod.

    3,tie rod with waterproof plate etc.

    .
  • Tie rod with different surface treatment:

    1,galvanized.

    2,hot dip galvanized.

    3,paint coated

NameValue
BrandTOPONE
Production Capacity50000 Piece/Pieces per Month
Place of OriginChina
CertificationGB/T 19001-2000 ISO 901:2000 Standard
Dimension(L*W*H)15/17mm
Weight1.5kg/m
Details show

Application
  • The tie rod is used inconcrete formwork fasten.
Shipping
  1. ship transportation
  2. INTERNATIONAL AIR MAIL: around 2-4 weeks to arrive
Payment
  1. TT30% IN ADVANCE, balance 70% BY TT BEFORE SHIPPMENT.
  2. L/C
Packing
The tie rod and accessaries are packed in woven bags .
Services
About US
We have about 20-year experiences on formwork fasten system. We are a typical China supplier and have taken part in the construction of all the Beijing Olympic Venues and all the nuclear power stations etc.

Our service\Buyer Guidelines
Our main products include frmwork fasten assembly, tie rod, coil rod, steel cone, wing nut, plate nut, dome nut, waller plate, and other formwork accessaries. We also supply base jack, head jack, shoring prop, and tilt up brace.

For any questions and comments, please feel free to contact us.

Tianpeng, makes constructions time-efficient and cost-effective.

Packaging Detail:According to customer's requirement
Delivery Detail:Within 25-30 days after 30% advance payment.

Related Product for construction formwork tie rod