Construction Building 2ton elevator - SC200/200

1.It have two cage and can load 2000kg per cage., 2.It have two 15kw (continuous work )motor., 3.It operation speed is 33m/min. - details see: https://www.buildingsupplieshub.com/construction-building-2ton-elevator-10060041
Type: ElevatorsPlace of Origin: Chongqing China (Mainland)Brand Name: Jida PaiModel Number: SC200/200
Usage: Construction hoistDrive Type: Rack & PinionElevator Type: Goods ElevatorsCounter -Weight: No
Amount of cage: 2Rated load per cage: 2000kg or 19 personColor of cage: Yellow or RedOperation speed: 33m/mim
Size of standard section: 0.71*0.71*1.508mSize of cage: 2*1.3*2.5mAmount of motor: 2Power source: Electrical
Max installation height: 300m   
Construction Building 2ton elevator
contact supplier for Construction Building 2ton elevator


1.SC200/200 Main Technical Parameter

No.ItemsParameter
1ModelSC200/200
2Work wayTransmission by gear and rack
3Counter-WeightNo
4Amount of cageTwo (have cab)
5Rated load2000kg( 19 person ) per cage
6Operation speed33.0m/min
7Size of Cage External(L×W×H)3.12×2.192×2.57m(have Cab)
8Size of Cage Internal(L×W×H)3×1.3×2.25m(no Cab)
9Size of standard section0.71×0.71×1.508m
10Safety-brake load≥40KN
11Overload protection deviceHave
12Electrical power(Continuous work)15KW
13CableTwo
14Amount of motor2~2.2m
15Distance between two attchment≤6m
16Weight of cage1800kg
17Weight of standard section170kg
18PackageBare&Band

2.The Standard section (It take the seamless steel pipe )

3.Control Panel

Packaging Detail:Bare and Bank
Delivery Detail:Contract take effect 30 days later ship the first batch

Related Product for Construction Building 2ton elevator