Cold formed steel frame prefab house/light gauge steel structure building - #91002

1. Light gauge steel structure building, 2. Well pre-designed & pre-engineered, 3. Customized, 4. Quick assembly/built - details see: https://www.buildingsupplieshub.com/cold-formed-steel-frame-prefab-house-light-gauge-steel-structure-building-10038469
Place of Origin: Shanghai China (Mainland)Brand Name: LYLUXModel Number: #91002Material: Steel
Use: Hotel,House,Office,Sentry Box,Guard House,VillaSteel: light gauge steelDesign: providedCladding: selected
Cold formed steel frame prefab house/light gauge steel structure building
contact supplier for Cold formed steel frame prefab house/light gauge steel structure building


OVERVIEW
Building style
Light gauge steel structure building of Residential
Style No.LYLUX #91002
StructureCold formed C & U section light gauge steel (LGS)
Construction AreaCustomized
DimensionCustomized
StoreyCustomized
Zone informationBedroomCustomized
Living roomCustomized
KitchenCustomized
BathroomCustomized
GarageNone
GardenNone


INTRODUCTION FOR COLD-FORMED LGS FRAME

LYLUX Cold- formed LGS (Light gauge steel) frame use economic steel coils with zinc or aluminium/zinc

coatings, which are subsequently formed into C-section for stud and U-section for track by the cold-forming

process. We commonly called this frame “Light gauge steel” since the steel thickness is normally less than

3 mm.

In the past, cold-formed products were mainly used as secondary components in steel or concrete structures,

there is now a wide marked for cold-formed structural elements. These structural elements are used as single

member like column, beams or purlins but also as components of residential, commercial, industrial building

system. In LYLUX system, the cold-formed elements play frequently a multifunctional role leading to economy

and simplicity of the low-rise building structure.

STRUCTURE SKETCH

FEATURE

Green - Green frame, Green building materials.

Healthy - Good ventilation system do good to healthy.

Comfortable - Excellent designing, good insulation.

Safe - Anti-seismic, anti-fire, anti-corrosion.

Durable - Galvanized high-strength steel frame.

Quality - We provide top-quality China made prefabricated steel buildings and accessories.

Cost - We pride ourselves in the fact that we always show our customers the best and least expensive way

to accomplish their project.

APPLICATION

MAIN COMPONENTS
Main StructureLGS C90*45*12*1.0 for steel frame
Wall SystemLGS+Insulation+OSB board+Cladding
Roof SystemLGS+Insulation+OSB board+Roof tile
Floor SystemLGS+Fiber cement board+Ground tile
CeilingLGS+Ceiling plasterboard
DoorsSteel or Wooden for PVC Composite door or customized
WindowsAluminum alloy double glazing windows or customized
KitchenSimple/middle/luxury or customized
BathroomCan be selected or customized
GardenPlastic wooden or PVC/Steel if request
GarageNone
OthersElectric/plumbing, etc. if customer request

HOW TO BUILD

ABOUT MANUFACTURE

PACKING & LOADING

DESIGNING TECHNIQUE NOTES

Materials: Galvanized cold formed light gauge steel, the thickness is no more than 2.5mm.

Frame life time: 50 years

Loads: Wind load, snow load, dead load, live load, etc. according to project local environment status.

Size of house: The maximum width and length is 12m(W) by 18m(L).

Unit transport length: ≤ 12m

Pre-panelized: Wall steel frame panel, floor steel frame panel, roof steel frame panel, all frame panels are

pre-panelized in our factory, but the size should be suit for container size.

Connection: Bolts for foundation and self-tapping for frame panel bond together.

Anticorrosion treatment: Over 220g/m2 Zinc galvanize coating.

Fire resistance: Normally 1 to 2 hours for steel frame.

Green and environmental protection material: Using light-weight, fire-resistance, good-insulation, high-

strength building materials.

LYLUX SERVICE

1. Consulting

2. Architectural Design

3. Building Materials Solution

4. Manufacturing

5. Construction

6. After service

Please refer to LYLUX website for more service details…

Packaging Detail:Packed in 40' HQ standard container
Delivery Detail:45-60 days after your deposit

Related Product for Cold formed steel frame prefab house/light gauge steel structure building