chromed plastic hand shower
1. Multi Functions, 2. ABS Hand Shower, 3. High Quality Chrome Plated, 4. Competitive Price Shower - details see: https://www.buildingsupplieshub.com/chromed-plastic-hand-shower-10001686
Type: Bath & Shower Faucets,Bathroom Faucet Accessories | Place of Origin: Zhejiang China (Mainland) | Brand Name: Baoda | Surface Finishing: Nickle |
Surface Treatment: Polished | Bath & Shower Faucet Type: Deck-Mounted B & S Faucets | Number of Handles: Single Handle | Style: Classic |
Valve Core Material: ABS plastics | Feature: Electric Faucets | Material: ABS Plastic | Finish available: White/Chrome/Brushed |
Water Outlet: Rainfall | Shape: Round | Guaranty: 2 years guarnty | Certification: ISO:2002,CE,TUV |
Temperature: 0--80 centigrade | Application: bathroom | Function: function |
Feature:
1) Accord with human body engineering,comfortable,not easy to slide.
2) Special distribution with filter washer,increasing a protective barrier.
3) The surface of multi-layer plating processes,resistant to corrosion and durable
4) More fast and convenient installation, use for DIY
5) Once wiping, the dirty of elastic nozzle is disappeared.
6) It has clean function,saving time and effort.
7)Machine Type:100T,128T,200T,320T,500T,ect.
8)Client project's 3D drawing or samples are highly appreciated.
9)Lead time:Meet the clients' requirements.
10)Samples will be sent for customer before production.
1 | Name | hand shower |
2 | Description: | Nice sunflower chrome plastic hand shower head with convenient function click switch. |
3 | Function: | *Saturating spray *Massage spray *Bubbling spray *Massage & Saturating spray *Bubbling & Saturating spray |
4 | Shower material: | ABS plastic |
5 | Available surface finish | White/Chrome/brushed nickle |
6 | Anticorrosion standard for sursafe plating: | Cass 4 hours |
7 | Working temprature: | 00C~800C |
8 | Mimimum quantity: | 500 pieces |
9 | Inner package: | In bulk/bubble bag/color card+blister/clamshell/color box. |
10 | Outer package: | Exporting master carton |
11 | Production lead time: | Up to order quantity.Default:30 days after order confirmation |
12 | Payment term: | 1).Deposit 50% before mass production and balance to be paid before shipment. 2).T/T or L/C at sight |
13 | Price term: | FOB Xiamen port |
Our factory
Our Certification
Our products
Our workships
Our shipment
Packaging Detail:inner is plastics bag outer is carton or customers' requirement. |
Delivery Detail:within 25-35 days after receiving down payment. |