china supplier Prefabricated houses,prefab house,mobile /modular houses

Light steel structure building is a new type of building structure system, - details see: https://www.buildingsupplieshub.com/china-supplier-prefabricated-houses-prefab-house-mobile-modular-houses-10038652
Place of Origin: Shandong China (Mainland)Brand Name: DFXMaterial: Sandwich PanelUse: Hotel,House,Office,House,Office,Shop,Villa,Warehouse,Workshop,Plant
main steel frame: Q345B ,Q235B steel structurebuilding size: as per customer confirmationwall and roof panel: EPS,glasswool,rockwool,Pu sandwich panelDoor: sandwich panel door, safety steel door, alluminum alloy dor
drawing design: CAD or 3D drawingdoor style: swing, sliding or roller door  
china supplier Prefabricated houses,prefab house,mobile /modular houses
contact supplier for china supplier Prefabricated houses,prefab house,mobile /modular houses


Specification of Prefab House

Description:

Modular house is made of light steel as the structure and sandwich panels for wall and roof. When delivery, it is knocking-down to save the space. When erection, it could be installed by common worker with electric tools according to instruction. The structure is connected by bolt and the wall is fixed by rivet. Waterproof design on the roof and without any measurement. Light material without overload, easy to pack and transport.

The house can be assembled and disassembled more than 6 times, and the service life is more than 15 years.

Characteristics:

1. Environment protective, no garbage caused

2. Doors, windows and interior partitions can be flexibly fixed

3. Beautiful appearance, different colors for the wall and roof.

4. Cost saving and transportation convenient

5. Anti-rust and normally more than 15 years using life

6. Safe and stable, can stand 8 grade earthquake.

Technical Parameter of standard prefabricated house:

Wind resistance: Grade 11(wind speed≤125.5km/h)

Earthquake resistance: Grade 7

Live load capacity of roofing: 0.5kn/m2

External and internal wall heat transmission coefficient: 0.35Kcal/m2hc

Live load of corridor is 2.0kn/ m2

Installation (it needs electric power)

Installation tools: electric drill, electric hammer, spanner, screwdriver, pulling rivet etc.

Installation efficiency: Four skilled labors one day can erect 40m2 house body.

Transportation:

Container: each 40ft container could load 120~150sqm house body material

Finished Project

Installation Project photos:

Oversea projects we undertook in the last few years:

Industrial Warehouse (13000 M2 )—Argentina

Warehouse (14000M2)---- Republic of Uzbekistan

Workshop (12000M2)----Canada

Warehouse(3600M2)---Romonia

Vegetable Market(2500M2)---- Mauritius

Pig shed(3500M2)---USA

Chicken shed(2800M2)—Austrilia

Aircraft Hangar(1300M2)------Austrilia

Warehouse(900M2)---- Mongolia

Prefabricated house(70M2)----800 sets---Angola

Container house(20’)-----60 sets—South Africa

We can provide the quotation , if you confirm the information as bellow:

*Wind speed(KM/H)
*Snow load (KG/M2)

*Rain load (KG/M2)
*Earthquake load if have
*Demands for doors and windows
*Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!

Workshop View and production line :

Goods Packing photos:

Packaging Detail:(1)Packing the pipes into the bundles by the steel strip (2)packing the welded steel structure parts by some fabric (3)packing the small parts by bags and EPS foam (4)packing sets parts by some box
Delivery Detail:Ship the goods in 15 days after receiving the deposit

Related Product for china supplier Prefabricated houses,prefab house,mobile /modular houses