China Engineered Scaffolding Board - FS LVL Scaffolding Plank

China Engineered Scaffolding:, 1)WBP glue waterproof:, 2)Size:38*225&235*3900mm, 3)Material:pine lvl, 4)Moisture content:<12% - details see: https://www.buildingsupplieshub.com/china-engineered-scaffolding-board-10080649
Place of Origin: Shandong China (Mainland)Brand Name: Golden FushiModel Number: FS LVL Scaffolding PlankName: Scaffolding Plank
test stardard: OSHAsize: 38*225*3900mmglue: wbp,melamineraw material: pine lvl
China Engineered Scaffolding Board
contact supplier for China Engineered Scaffolding Board


China Engineered Scaffolding Planks:

1> Purpose:For construction use

2> Material:Radiata pine or Masson Pine

3> Glue:WBP(Waterproof Phenol Formaldehyde Resin Glue)

4> Size:38.1*225&235*3900mm

5> Moisture Content:below 12%

6> Thickness of veneers:Core veneer 2.6mm(-0.1mm,+0.1mm) Face veneer:1.5mm

7> Density:615kgs/cbm

8> Grain direction:Parallel to the grain

9> Veneer joints:Overlap

10>Stencil mark&end sealant:according to third party certificates or customer's requirements

11>Surface treatment:All arrises are chamferrying by 5mm at 45 angle degree for easy handing.wax-coated on both sides. paint at the ends

12>Anti-Bending Performance:Perform the test with a span of 3.0mm(the supports are made from steel tube with diameter 60mm, and the contacting surface is 5*235mm each)with two loads on specimen(which dimension is D38.1*W235*L>3200mm),measuring two concentrated points on the board with a distance of 990mm as center points for two loads(area contacting with specimen is 425*200mm each),with weight of 73kg(160lbs)each,the peak deflection should be within 4.95cm.

13>Loading Appr.48m3/40HQ(1435pcs for 38.1*225*3900mm)

14>Weight Limited at qingdao port:26 tons

15>Quality control program:Physical performance test.Veneer Graded by Ultrasonic Machine,Vacuum Pressure and Soak test.MOE onlin test.Test reference:ASTMD Standards.

16>Production Capacity:90,000pcs/month

18>Payment:Irrevocable L/C at sight or T/T(30% down payments against order,70% balance against B/L copy within 3 days.)

Packaging Detail:standard exporting packing or following the customer's requirements
Delivery Detail:within two weeks

Related Product for China Engineered Scaffolding Board