Cargo and passenger elevator - SC200/200
Type: Elevators | Place of Origin: Chongqing China (Mainland) | Brand Name: Ji Da Pai | Model Number: SC200/200 |
Usage: Transport construction staff and materials | Drive Type: Rack & Pinion | Elevator Type: Goods Elevators | capacity: 2tons*2cages |
height: 10--300m | Size of standard section: 0.71*0.71*1.508 | Operation speed: 38.5m/min | Color of cage: Red or Yellow |
Color of standard mast: Red or Black | Size of cage: 3*1.3*2.5m |
Cargo and passenger elevator E series product SC200/200 is one product of our E series products. E series products is one of main products of ours. SC200/200 includes a single mast and two cages. Every cage is a independent system. It can operate independently. In the transmission system of the lift, the motor be used is three-phase asynchronous(model YZEJ132M)with brake, which is capable ofstarting stable and compensating automatically the friction gap. We also use plane three-rings enveloping worm reducer. The mast cosists of many standard sections linking together in high-strength bolts.
E contains : E--- Standard Provision(with a cab,no cable pulley);
E1(with a cab and cable pulley);
E2--(no cab and no cable pulley);
E3(with cable pulley, no cab);
EW----External style(it means the reducer and the motors are installed out of the cage.) EW, E1W, E2W, E3W
Based on different conditions and environments, we can provide different size products to meet your request. The followings descript the range of the products consfiguration and technical parameters of SC200/200.
1. Amount of cage: 2
2. Rated load: 19 people×2cages/2000kg×2cages
3. Lifting speed: 38.5m/min
4. Max. height: 300m
5. Size of cage: 3m×1.3m/1.5m×2.5m/2.7m
6. Size of mast section: 0.71m×0.71m×1.508m
7. Safety-brake load: ≥40KN
8. Electrical power: Continuous work: 12KW/jc25%; 15KW
9. Amount of motor: 3×2cages
10. Distance between two attachments: ≤6m
11. Weight of one mast section: 170kg
12. Weight of cage: 1800kg
Packaging Detail:paced in container or loose in bulk |
Delivery Detail:the contract enter into force 25-30 days later |