bitumen coated fiberglass geogrid with CE certificate (asphalt reinforcement ) - EGA50-50, EGA80-80, EGA100-100
1)fiberglass geogrid with CE certificate, 2)Materials:fiberglass, 3) Tensile strength:MD/CD:30 ~ 200kn/m, 4)WIdth:1 ~ 6m - details see: https://www.buildingsupplieshub.com/bitumen-coated-fiberglass-geogrid-with-ce-certificate-asphalt-reinforcement-10057347
Type: Geogrids | Place of Origin: Shandong China (Mainland) | Brand Name: OEM or Road | Model Number: EGA50-50, EGA80-80, EGA100-100 |
Material: Fiberglass | Coating: asphalt | feature: High flexibility and large range of temperature |

1)fiberglass geogrid with CE certificate
2)Materials:fiberglass
3) Tensile strength:MD/CD:30 ~ 200kn/m
4)WIdth:1 ~ 6m
bitumen coated fiberglass geogrid(asphalt reinforcement )
Introduction:Fiberglass geogrid is a kind of new favorable earthwork base material to strengthen the road surface and roadbed. This product is composed of fiberglass filaments that are coated with an inorganic sizing agent
Features:
1. High tensile strength in warp and across directions
2. Low Elongation
3. High flexibility
4. High and low temperature resistance
Application:This product is used to strengthen the soft land, such as railway, airport, irrigation work, and dyke, roadbed, and softland loading capacity strengthen.
Performance parameter of fiberglass geogrid
Specification | EGA30-30 | EGA50-50 | EGA80-80 | EGA100-100 | EGA150-150 | ||
Mesh size(mm) | 25.4×25.4or12.5×12.5 | ||||||
Breaking strength≥(KN/m) | Warpdirection | 30 | 50 | 80 | 100 | 150 | |
Across warp | 30 | 50 | 80 | 100 | 150 | ||
Elongation at break≤(%) | Warp direction | 3 | |||||
Across warp | 3 | ||||||
Elasticity modulus(GPA) | 67 | ||||||
Thermal tolerance(°c) | -100~280 |
Packaging Detail:Standard export Packing. Or Packed as customers' requests. |
Delivery Detail:For 40HC,within 10 days after receipt of L/C or deposit |