Best price Widely Used Hot Dip galvanized Steel cuplock scaffolding - AC-Cuplock Scaffolding

Widely Used Steel Cuplock Scaffolding, Material:Q235, Standard,Ledger,Diagonal,Plank, Surface Treatment:Hot dip Galvanized,Paint - details see: https://www.buildingsupplieshub.com/best-price-widely-used-hot-dip-galvanized-steel-cuplock-scaffolding-10079311
Place of Origin: Beijing China (Mainland)Brand Name: ACModel Number: AC-Cuplock ScaffoldingStandard Length: 500/1000/1500/2000/2500/3000/4000mm
Standard Size: Diameter-48/48.3mm;Thickness-2.5/2.75/3.0/3.25mmLedger Length: 732/1088/1400/1572/2072/2572/3072mmLedger Size: Diameter-48/48.3mm; Thickness-2.5/2.75/3.0/3.25mmCuplock: Diameter-123mm; Weight-0.45kg
Base Collar: Length-330mm; Weight-2.3kgDiagonal: Diameter-48/48.3mm; Thickness-2.5mmBase Plate: Diameter*Length-30*500/34*500mmMaterial: Q235 Carbon Steel
Surface Treatment: Electroplate/Galvanized/Hot Dip/Paint Dipping/ Powder Coated   
Best price Widely Used Hot Dip galvanized Steel cuplock scaffolding
contact supplier for Best price Widely Used Hot Dip galvanized Steel cuplock scaffolding


Best price Widely Used Hot Dip galvanized Steel cuplock scaffolding

Cuplock Scaffolding

Sandard

Dia*Length Weight

48*3000mm 16.00kg

48*2500mm 13.48kg

48*2000mm 10.96kg

48*1500mm 8.44kg

48*1000mm 5.91kg

48*500mm 3.39kg

Ledger

Length Weight

3050mm 11.06kg

2440mm 8.80kg

1830mm 6.69kg

1520mm 5.58kg

1220mm 4.50kg

910mm 3.39kg

Diagonal Brace

Width*Height Weight

3050*2000mm 10.38 kg

2440*2000mm 9.10 kg

2130*2000mm 7.96 kg

1520*2000mm 7.44 k

1220*2000mm 7.00kg

Ring To Ring:500mm

Detailed Photos

1.Bowl & Standard Design

2.The Cup & Ledger Blade

1 Multi-Function

2 Easy To Assemble: Joint assembling-6 times faster than others

3 High Efficiency: Avoiding of the assembling screws

4 Good Intensity: Anti-bending,anti-shearing and anti-torque

5 Safe And Reliable: Being equipped with full safety equipment.

6 Simple Maintenance: Light design, easy for packing.

Delivery Information

Package:100-150pcs Per Bulk Bundled Up With Steel Belt/Customized

Delivery Date:10-25 Days After the Deposit Received & All Information Confirmed

Payment Term:30% T/T Deposit Before Production + 70% T/T Before Shipment

Packaging Detail:100-150pcs Per Bulk Bundled Up With Steel Belt + Container Customized Package Available.
Delivery Detail:10-25 days on receipt of your deposits.

Related Product for Best price Widely Used Hot Dip galvanized Steel cuplock scaffolding