Best Price Cuplock Scaffolding for Building Construction, Made in Guangzhou - CS Cuplock Scaffolding
Place of Origin: Guangdong China (Mainland) | Brand Name: AJ Cuplock Scaffolding | Model Number: CS Cuplock Scaffolding | Material: Q235 steel |
Surface treatment: dip painted,galvanized | Color: dark red,orange,blue,silver(galvanized) | Technique: CO2 arc welded | Height: 100/1500/2500/3000mm/set |
Diameter: 48mm | Thickness: 2.75/3.0/3.2mm | Type: heavy duty scaffolding | Application: cuplock scaffolding for inside and outside construction |
Certification: SGS |
Best PriceCuplock Scaffoldingfor Building Construction, Made in Guangzhou
Features of Best Price Cuplock Scaffolding for Building Construction
1.Cuplock scaffoldingsystem has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.
2. AJcuplock scffoldingis made by Q235 steel which is strong and durable.
3. A completecuplock scaffoldingsystem includes standards, ledgers, or diagonal braces.
4. The accessories ofcuplock scaffoldingsystem are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc.
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends.
Specificationsof Best Price Cuplock Scaffolding for Building Construction
Name | Cuplock Scaffolding | |||
Place of Origin | Guangzhou, China | |||
Brand | AJ | |||
Size (more customized size available) | Standard(mm) | Ledger(mm) | Diameter | Thickness(mm) |
3000 | 2500 | 48 | 2.75/3/3.2 | |
2500 | 1800 | 48 | 2.75/3/3.2 | |
2000 | 1200 | 48 | 2.75/3/3.2 | |
1500 | 900 | 48 | 2.75/3/3.2 | |
1000 | 600 | 48 | 2.75/3/3.2 | |
Material | Q235 carbon steel | |||
Surface treatment | Hot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted | |||
Color | Orange, dark red, blue, or as you required | |||
Welding technique | CO2 arc Welding | |||
Certification | SGS;EN12810 | |||
MOQ(Minimum Order Quantity) | 1 20ft container | |||
Payment | T/T | |||
Delivery time | 20days after deposit | |||
Package | Without outer packing or as you required | |||
Production capacity | 100 tons for each day | |||
Factory Address | Ai De Li Road, Nan an Villlage, Xintang Town, Zengcheng, Guangzhou, China(Call us if need address in Chinese) | |||
Tel/Fax | 86-020-32897881 86-020-32897881 |
*We can provide different sizes of cuplock scaffolding for you.
Product Details
Cuplock scaffolding system:
Standards:
Ledgers:
Diagonal Brace:
Project Samples
Why Choose Us
1. We are experienced manufacturer in Guangzhou with more than14 yearsexperience and cooperating with more than70 countries.
2. We supply qualified products which are certified bySGS and EN12810. Strict QC to make sure your profit.
3. Timely deliverycan be guaranteed because we have a factory which covers an area of 8000sqm and its daily output is more than 50 tons.
4. A competitive price can be offered because we are a professional manufaturer of scaffolding
with an advantage on cost-controlling & production management.
Our main products include formwork system, concrete machine, racking system, all kindsof scaffolding system, scaffolding accessories etc.
If you have any problems, please feel free to contact me.
Our company is near the Huangpu port and Canton Fair Center; you are very welcome to come toour company.
How to Contact Us
Guangzhou AJ Construction Material Co.,Ltd
Tel:0086-20-32897881 Fax:0086-20-32897881
If you are are unsure or simply need some advice, either
email us or pick up the phone and call our friendly
experienced staff and we'll only be to glad to help.
1.There are several cup pins oncuplock scaffoldingstandard which can help to fix the top cup,then the
cuplockscaffoldingcan be lock more steady .
2.Interior of galvanized cuplock bottom cups have gear teeth which can help to make thecuplock scaffolding
more steady.
3.Heavy duty cuplock scaffoldingis strong to support concrete slab and proper for masonry construction.
4.Cuplock scaffolding systemis welded with some sipgot which is the another parts of thecuplock
scaffoldingto make the cuplock system more steady.
Packaging Detail:Cuplock scaffolding is in bare package, loading in the container. A 20 GP container can load 26 tons of cuplock scaffolding. |
Delivery Detail:10-20 days after deposit |