Place of Origin: Zhejiang China (Mainland) | Brand Name: ANT | Model Number: ANT-222 | usage: masonry mortar |
type: mixing mortar | color: grey,white | construction temperature: 5°C-35°C | coating thickness: 4mm |
mix ratio of adhesive to water: 25kgs to 6.0-6.5kgs |
ANT-222Autoclaved Lighweight Concrete Adhesive is specially the masonry and building material which designs for the aeroconcrete artificial brick, this water retention property is good, has the good cohesiveness with the parent metal, is suitable in the thin layer masonry and building, provides the even cohesional strength to the high and low block, guaranteed that the smallest joint between the artificial brick, can enable the light quality tong artificial brick the characteristic to obtain best manifestation.
Technical performance
1,good binding property
2,good weather resistance
3,good crack resistance
4,waterproof
5,simple operation
Applicable Area
Mainly uses in the light quality laying bricks. Aeroconcrete artificial brick series masonry and building.
The requirement of the applying area
The artificial brick surface must solid, smooth, not have the crack, not have the remover and to cause the isolation the medium to adhere to stick cohere, to has flaw and so on angle artificial bricks should advance patching, if the artificial brick surface easy dusting, to use bottom Tu Ji to process the surface first.
Mixing and the coating technique
1st, with manual or the electrically operated agitation, joins the water purification to the clean vessel to stir while joins this, mixes the even thick pulpous state until the agitation, not agglomerates and the air bubble (each 25kg medicinal powder needs water used 5.0-6.0kg), settles the 5-8 minute, stirs one time then to use, stirs when does not need to add water.
2nd, will stir the good pulp with the trowel to smudge in the light quality brick construction surface, thickness approximately will be 4mm, then the artificial brick masonry and building in the corresponding position, the forcibly compaction then, each time Tu Ban the scope should build suitably as take 10 minutes internal energy.
Engineering Exhibition
Notice Items:
1st, the construction temperature 5°C-35°C, in the construction process should avoid the intense solarization and the rain drenches, constructs the latter day of planted agent to avoid vibrating.
2rd, mixes up the material the pot life is 1.5 hours, surpasses this deadline the material to give up not using.
3nd, this including alkali ingredient, when use please note protects the skin and the eye, the detailed material please refer to the product to explain or relates with us.
Storage and packing:
This product can be stored for 9 months under seal in cool and dry place. packing: 25 kgs/bag.
Payment Terms:L/C,T/T.
Delivery time: 10 days after the receipt of deposit.
Packaging Detail:packing: 25 kgs per bag. |