AS1576 Australia working platform kwikstage scaffold/scaffolding - kwikstage scaffold/scaffolding

1)SGS,AS1576, 2)Automatic welding by machine, 3)For working platform and support system, 4)OEM offered, 5)Promptly delivery - details see: https://www.buildingsupplieshub.com/as1576-australia-working-platform-kwikstage-scaffold-scaffolding-10079577
Place of Origin: Guangdong China (Mainland)Brand Name: shuangma kwikstage scaffoldingModel Number: kwikstage scaffold/scaffoldingMaterial: Q235/Q345 steel tube raw material
Surface Treatment: Hot Dip Galvanized,Dip Painted,Galvanizedsize: 1000/2000/3000mm or as your requesttube diameter: 48.3mmtube thickness: 3.25mm,3.0mm,3.8mm
color: silver,dark red,orangeTechnique: Automatic welding by machineWorking life: 7-9 years normallyApplication: buidling construction for outside working platform or formwork support
Certificate: AS1576,SGS test report for loading capacity   
AS1576 Australia working platform kwikstage scaffold/scaffolding
contact supplier for AS1576 Australia working platform kwikstage scaffold/scaffolding


Detail information about Kwikstage scaffolding:
NameKwikstage scaffolding
Place of OriginGuangdong China
Brand nameShuangma
SizeØ48.3*3.25*1000/2000/3000mm or as your request
Main MaterialQ235 steel tube
Surface TreatmentHot Dip Galvanized, Dip Painted, Galvanized
ColorSilver, Orange, dark red
CertificateSGS test for loading capacity, AS1576
ServiceOEM Service available
MOQone 20ft container
PaymentT/T.L/C
Delivery TimeAbout 20-30 days after confirmation
Packingin bulk or steel pallet or as your request
production capability100tons per day
Manufactory LocationZengcheng district, Guangzhou, Guangdong Province, China.

If you have any questions, pls feel free to contact us!

Contact: Steven Wu

TEL:86-13066354373

Skype: steven19871231

If you have any questions, pls feel free to contact us,

Any your requirements will be highly appreciated!

Contact: Steven Wu

TEL:86-13066354373

Skype: steven19871231

Have a nice day !

Packaging Detail:in bulk or steel palletOne 20ft container can load about 25 tons of Kwikstage scaffolding
Delivery Detail:20 to 30 days after order confirmation

Related Product for AS1576 Australia working platform kwikstage scaffold/scaffolding