architecture design of houses cabin designs - YH T-style

1)Light weight ;Sound Insulation;Heat Insulation;Waterproof., 2)Easy assemble;Flexible layout;Longevity service. - details see: https://www.buildingsupplieshub.com/architecture-design-of-houses-cabin-designs-10040447
Place of Origin: Guangdong China (Mainland)Brand Name: YH buildingModel Number: YH T-styleBody structure: U shaped steel and angle iron
Roof: PU or EPS sandwich panelExt-wall: EPS sandwich panelPartition wall: EPS sandwich panelFloor: One/two/three
Size: Standard or customizePacking: 300-500m2 40FT containerInstallation: Professional guideLayout design: Technical support
Stock: Standard prefab house   
architecture design of houses cabin designs
contact supplier for architecture design of houses cabin designs


Prefabricated House Features

  1. Light steel structure prefabricated house with color steel sandwich panel
  2. Good ability to assemble and disassemble for several times without damage.
  3. Doors, windows and interior partitions can be flexibly fixed
  4. Ceiling, floor, eaves, and color steel door are optional for customers.
  5. Cost saving and transportation convenient
  6. Anti-rust.
  7. Widely used in construction site, office building, dormitory etc.
  8. Single storey, double storey or three storey for choice
  9. Single slope or double slope for choice.

YH prefab house

1

Body structure

Profile steel and angle steel

2

Roof

PU sandwich panel

EPS sandwich panel

Color coated corrugated panel without insulation layer

3

Ex-Wall

EPS sandwich panel
PU sandwich panel
Rock wool sandwich panel

4

Partition wall

EPS sandwich panel
PU sandwich panel
Rock wool sandwich panel

5

Window

Aluminum window / PVC sliding window

6

Door

EPS Sandwich panel

7

Connection way

Stone bolt and high strength bolts

If two or three floors

1

Staircase

Comprise of steel structure

2

Footpath

Galvanized Steel Plain Sheet press

3

Indoor floor board

15mm plywood or customize

Application remind:


1. Please don't change the structure, don't pick out any screws or parts and don't increase or decrease any partitions after the installation. If necessary please contact us and do the changes afterour permission. Or you have to afford the result yourself.

2. The light steel parts should paint in one to two years in order to keep it's service time longer and the external appearance looks as good as new.

3. Prefabricated house is the whole connection of steel construction parts. If you want to use the electricity facilities, please don't bond the lines directly onto the steel structure. You have to use some abundant parts to put the lines and facilities to avoid accident.

Packaging Detail:standard packing
Delivery Detail:7-15days

Related Product for architecture design of houses cabin designs