aluminum scaffolding - SD-1.35L
Place of Origin: Guangdong China (Mainland) | Brand Name: LB | Model Number: SD-1.35L | material: aluminum alloy 6082-T6 |
thickness: 51x2mm,51x3mm | size: 1.35x2m x(2m--20m) | color: silver | loading: 900kgs |
Double width uprightness climb ladder aluminum scaffolding:
It accord with Europe safety standard HD1004,completely,also supply to you scaffolding assembled.Its construction can save platform's space, reduce the building time,can avoid that worker ignore to build climb ladder.Work platform can be built in each rung,each rung height is 50cm,it is very fliexible and parts utilize rate due to its perfect assemble function .Rapid convenience,it is best for cleaning and maintaintaining lines.
double width | optional:135mm*200mm,135*250mm,135*300mm |
height | optionla:from 2M to 40M base on the working environment |
loading capacity(each floor) | 272kgs |
loading capacity(each set) | 900kgs |
material | aluminum alloy 6082-t6,51x2mm |
aluminum scaffolding parts
Pull stay bar: Have interlock design.very easy to load and remove,it has red color(inclined)and blue color |
Caster and adjustable leg: Can choose six inch(150mm)and eight inch (200mm)caster and flat foot pad,oil resistance,antisepsis,very firmly and durable,not scrape the floor. Adjustable feet range can be 290mm,matched them can fit for roughness ground. |
Platform: Platform is be divided hole platform and no-hole platform.No-hole platform used for worker restand cushion,Hole platform is convenient to climb the higher platform and work.Hinge of the removable door is durable,it can fasten the removable door when move the door. Fixed wire prevent the door slip,Pothook of the platform is convenient to handle,no-slip board is special for wet weather,set aluminum around the platform have very large protect function. |
Guardrail board: The guardrail board which is connected on the side of the scaffolding working platform,avoids tools dropping from the working high latitude,make sure be safety. |
long outrigger
The long outrigger make scaffolding much more sturdy
Packaging Detail:bubble film |
Delivery Detail:15 days one container |