Aluminum-Plastic window profile - Aluminum-Plastic window profile
Type: Plastic Profiles | Place of Origin: China (Mainland) | Brand Name: Swan Profile | Model Number: Aluminum-Plastic window profile |
Color: as your request | Brand Impact: China Well-known Trademark, top 10 in China | Standard: GB/T8814-2004 | Length/Piece: 5.8m(20GP), 5.9m with 6mm for 40GP,40HQ |
Certificate: ISO14001:2004 EMS, ISO9001:2008 QMS | Delivery time: 15days | series: 60casement series,80 sliding series |

Why are you chosing us?
Excellent weather ability.
Excellent heat insulation and energy saving.
Excellent water and air resistance.
Excellent corrosion resistance.
Excellent fire proofing and sound insulation.
Environmentally friendly.
Easy to clean.
Easy to assemble,user friendly.
Econimical,saving you money.
Attractive appearance.
Standards:
ISO9001-2000 International Quality System Certification.
ISO14001-2004 International Environment System Certification.
GB/T8814-2004.
Specifications:
1. 60 casement series.
2. 60/80/88 sliding series.
3. 60/80 double color co-extrusion sliding/casement series.
4. Aluminum-Plastics profile series.
5.whole color body with wood grain series
6.LG laminate film profile series
Color:
White profile, Color co-extruded profile and colored body profile
Color can be made for your requirements.
Our company:
Henan Swan Profile Co., Ltd. We specialize in this field for 12 years, with the strength of the PVC-U profile for window and door, with good quality and pretty competitive price.
We can supply full range of PVC plastic profile with different specification and colors.
We are working hard, make you more satisfied! Your investigation in our company and trial order is warmly welcome.
2 Products Characteristics.
2.1Welding parameters.
Pvc welding of plastic doors and windows are five main process parameters,
five process parameters and control range are as follows:
Welding margin | 2-4mm / single head (typically 3mm) |
Welding temperature | 245°C-262°C(heating plate surface temperature) |
Heating time | 25s-30s |
Heating welding pressure | 0.3-0 .4 MPa |
Welding pressure holding time | 22s-30s |
The 5 parameters composed of a group, each parameter can be changed.
According to a lot ofpractical experience, and generally fixed welding margin
of3mm, heating I welded a pressureof0.4 MPa, welding packing time30s.
2.2Welding process considerations of our profducts:
Processing window and door according to the parameter, the quality of you window
and door will bepretty good.
3 Packaging
2. Putting the profiles in plastic film bags.
3. Wraping the plastic bags with sticky tapes at both ends.
4. Packing the plastic bags with packing belt firmly in middle and both sides
4 Production process
5Enterprise Show
5.1 Enterprise Brief Introduction
ØWe are a professional manufacture of upvc profile for more than 13years;
we have800employees, covering an area of 150,000m2, located in Qinyang
city, Henan province, China;
ØWe are China Well-known Trademark, forefront company in China;
ØCCTV List Brand
ØWe have subsidizedmore than 100 poor college students;
ØOur products are National Inspect free products;
ØWe have donated more than 5millions RMB and goods and materials for the society.
Our marketplace
Customers' visiting
5.2 EnterpriseConcept
operationprinciple:Manage sincerely
Enterprise target:Customer satisfaction
Enterprise mission:Benefitsthe society
Enterprise spirit:Pragmatic, Innovative,Enterprising.
5.3 Physical & Chemical Inspection Center
Around 9tons for 20GP, 23tons for 40HQ. So the 40HQ can save more
money for the land freight, shipping fee, inspection fee and others.
For more information, pls contact me.
7. Parts of our projects
Below is little parts of our products, want to see more, pls visit our
Chinese website:http://www.tecx.cn. We have a lot of projects at the
bottom of the homepage.
For more information, please visit our website.
URL: Http://texc.en.alibaba.com.
Now, pls send me your requirements.
Packaging Detail:1. Bind the profiles with plastic ropes in middle and both sides. 2. Put the profiles in plastic film bags. 3. Wrap the plastic bags with sticky tapes at both ends. 4. Pack the plastic bags with packing belt firmly in middle and both sides. |
Delivery Detail:7-15days |