Albania Warehouse Project---Steel Structure Warehouse - PTW

Steel Structure Warehouse, 1)Steel structure and sandwich wall panel;, 2)Turn-Key solution, 3)High wind & cold resistance - details see: https://www.buildingsupplieshub.com/albania-warehouse-project-steel-structure-warehouse-10039912
Place of Origin: Zhejiang China (Mainland)Brand Name: PTHModel Number: PTWMain structure: H type column, Z type purlin, C type purlin
Wall system: EPS/Rock wool panel, corrugated color steelRoof: EPS sandwich panel, corrugated color steelCertificate: ISO,CEFloor/foundation: PVC/concrate
Window: aluminum alloyDoor: steel door,auto rolling doorCrane: with or w/o, 5T, 6T, 10T, 20T and aboveInsulation: glass wool
Complement: Skylight and ventilator   
Albania Warehouse Project---Steel Structure Warehouse
contact supplier for Albania Warehouse Project---Steel Structure Warehouse


1. Brief of the project:

Sales man:

Project No.: PTW2W110-1

Location: Albania
Useage: Used as warehouse

Acreage: 3310sqm
Producing time: 2012.03.16

Delivery: 2X40'HQ +1X20’GP
Installation: 30 days

2. Materials used:


1)Primary structure: welding H type steel is Q345,hot rolled H type steel is Q2.

2)Roof panel: 0.5mm corrugated colored steel sheet +50mm glass wool

3)Wall panel: 50mm thickness PU corrugated sandwich panel ,both sheets are 0.4 2mm(outside is glass gray, inside is white grey) ,PU density:40kg/m3

4)Window: 5000*1500 aluminum alloy double glass sliding window

5)Door: PU sandwich with both side colored steel electrical rolling shutter.

3. Drawings and pictures:

Floor plan

Drawing of the Mezzanine

Elevation

Structure

Inside view after the installation

Wall panel--PU sandwich panel

Over view of this project

Packaging Detail:Flat packing, main structure packed in an integrated rack made by H beams, other parts packed in parcels, all loaded into 40FT HQ. Safe and easy handle.
Delivery Detail:35 days

Related Product for Albania Warehouse Project---Steel Structure Warehouse