8' Aluminum Plywood Plank For Construction - ZY022
Place of Origin: TIA,Tianjin China (Mainland) China (Mainland) | Brand Name: zhanye | Model Number: ZY022 | Type: Scaffolding Parts |
Size: 7'x19'' | Lengths: 5' 7' 8' 10'or as your requirement | materials: aluminum and plywood | Scaffolding Part Type: Scaffolding Planks |
OEM: Offered | Certificate: OSHA |
Aluminum plywood plank for scaffold
1) 19 " Width
2) Three Boards will Ddeck a Standard 5' Wide Scaffold Frame
3) 8' Lengths or as your requirement
4) Heavy Gauge Heat-treated Structural Aluminum Alloy Side Rails and Cross Braces
5) height: 2.08''
6)Only 35.1 Lbs. per 7' Length
7) 1/2" Exterior Plywood Walking Surface
8) No-lap End Connectors for Smoother Runs Bolt-on Toe Board Clip Availability
9) Bolt-on toe board clip availability
10) US/Canadian applicability
11) Meets 75 lbs per square ft. loading up to 10ft length
No | Item | Data |
1 | Brand | ZhanYe |
2 | Model | ZY011 |
3 | Material | Plywood-Aluminium |
4 | Width | W19'' |
5 | Length | 7' 8' 10' (Customized Length Acceptable) |
6 | Loading | 520pcs Capacity In 40' Container |
7 | Weight | 29.10Ibs (13.20kg) |
8 | Hooks | Both Ends With |
9 | SWL | Meet American Standrad Min75 lbs/ Square Foot |
SHOW OF OUR PRODUCTS
II . Packing Details
Bulk Package Or As Per Customer Required
III. Delivery Time :
3-4 Weeks To Arrange Shipment On Vessel
IV. Quality Inspections:
Third Party Inspections Or Customer Authorized Staff Inspection are allowed.
V. Product Superiorities:
No | Item |
1 | Conform American Testing Standard |
2 | Good SWL Ability |
3 | Easily Take And Usage |
Tianjin Zhanye Metal Products Co.,Ltd
Why us?
Our company is a professional manufacturer of Scaffolding Frames, Steel Pipes, Bridge Leg, Aluminium Plank,Stairway Unit ,Aluminum Formwork,etc. We mainly have worked with NothAmerica,South America,India,Europe about six years
You are always welcomed to our factory .
Packaging Detail:Bulk Packing Or Palletized |
Delivery Detail:3-4 Weeks Since Production Schedule |