20ft office container house 20 ft modular container home - MC-0067
1. Easy and Qucik to Install, 2. Dismantable, 3. Cost effective to ship, 4. Insulated & Acoustic, 5.20 ft modular container - details see: https://www.buildingsupplieshub.com/20ft-office-container-house-20-ft-modular-container-home-10038463
Place of Origin: Jiangsu China (Mainland) | Brand Name: MoSteel | Model Number: MC-0067 | Material: Sandwich Panel |
Use: Hotel,House,Office,Toilet,Villa,Workers Accommodation | Size: 6*2.4m or customized in quantity | Insulation: Rock wool or specially required | Floor: Vinyl or composite timber floor |
Wall: Sandwich panel made by ourselves | Ceiling: Sandwich panel made by ourselves | Door: Steel door | Window: PVC window or Aluminum |
Installation: 2 men 4 hours | Freight: A quarter of 20ft container | Function: Accommodation, office, ablution, etc. |
20 ft modular container home
How doesMoSteelbeat all the competitors?
A. Quailty--- Approved by German project management team.
B. Price--- Main materials produced by ourselves.
C. Lead Time--- High efficiency management plus controlled material supply.
Introduction ofMoSteelFlat Pack Container House
1. Product Specification
Size | External | 6058mm(L)* 2438mm(W)* 2896mm(H) |
Internal | 5820mm(L)* 2200mm(W)* 2680mm(H) | |
Color | Standard: White. (May be customized as per your requirements) | |
Steel Frame | 3mm (Hot-galvanized) | |
Wall | 60mm Rock wool sandwich panel | |
Roof | 1st layer | 50mm Rock wool sandwich panel |
2nd layer | 100mm thermal insulation | |
3rd layer | Galvanized roof tile | |
Floor | 1st layer | Hot-galvanized steel sheet |
2nd layer | 20mm XPS board | |
3rd layer | 10mm Cement board | |
4th layer | Vinyl Floor | |
Door (1pc) | Steel security door (with keys): | |
Size- 840mm*2000mm (May be customized): | ||
Window (2pcs) | Sliding PVC windows: Size--800mm*1100mm (May be customized) | |
Electricity | Distribution box*1 | |
Circuit break*1 | ||
Ceiling Lights*2 | ||
Sockets*3 | ||
Switch*1 | ||
Local standard cables | ||
Water pipes | Local standard supply and drainage pipes | |
Usage | Accommodation, office, living room, hotel, meeting room, dormitory, shop, booth, toilet, storage, kitchen, shower room and so on. |
2. Manufacturing Process
3. Floor Plans
4. Product Photos
5. Packaging Details
4 Units will be transported as 1 20ft container.
6. Site Assembly
The assembly on site is very easy. It only takes 2 men half a day to finish 1 single unit.
7. Projects
Any more questions, pls send an enquiry to us!
Packaging Detail:Covered with plywood and wrapped with plastic foam |
Delivery Detail:15-30 days depending on the manufacturing program |